Power has been restored to East Point and all of our broadcasters are back online.
Our broadcaster at the Ferry Landing has stopped passing traffic. Our technicians are currently checking for the problem.
The outage was resolved after an electrical equipment swap at the site. All connections came back up about a day and a half after the
Troubleshooting the issue is still ongoing. We are working on getting a local technician to analyze the equipment onsite.
Designed By Us | Hosted At Orcas Web | A MMXX Product